Greenhouse Update
03/11/08 18:17 Filed in: General
It was such a beautiful day today that I spent a lot of time down at the greenhouse and outdoor classroom (photos are posted here). Every time I visit I find more and more work that needs to be done. The greenhouse is well on its way to being functional. Before we can actually use it we need to:

- Complete a thorough cleaning of the inside
- Repair stairs and handrails
- Clear the area around the greenhouse of saplings and brush (get out the chain saws!!!)
- Either finish running the pvc pipe and/or run garden hose to supply water
- Cut out the planting areas (internal pvc pipe needs to be cut in half length-wise to make planting beds)
- Install submersible pump to circulate the water in the greenhouse
- Run electricity from the outdoor classroom to run pump, fan, and heater

